Environmental Contractors, LLC performed asbestos abatement in the Hellgate High School gym in Missoula Montana. EC was performing asbestos abatement on the ceiling tiles in the gymnasium. In order to access the drop-in ceiling tiles, the entire gym was scaffolded and a work deck constructed at the top of the scaffolding with a full containment.